Skip to content
Taskmaster Wiki

Build the longest gingerbread bridge

From Taskmaster Wiki
Build the longest gingerbread bridge
ShowKongen Befaler
SeasonChristmas Special 2023
EpisodeEpisode 4: A bit like Jesus
Air date7 December 2023
TypeSolo Creative Physical Filmed Objective Single-brief Original
LocationKongen Befaler House (Seasons 6 - )
SpaceThe Study (Kongen Befaler Seasons 6 - )
Winner(s)Calle Hellevang-Larsen
Points awarded15

Task brief

The task brief is laid on the desk in the study.

Build the longest bridge from any chosen point to another.

You must be able to pass under the bridge for it to be measured and approved.

The bridge may only be built from gingerbread, knekk, icing sugar, Seigmenn, and Non-Stops.

You have one hour.

Your time starts now.

Task notes

  • Also on the desk are bowls filled with Laban Seigmenn jelly candies, Non-Stops (chocolate candies with fruit-flavoured crispy coatings), sugar, icing sugar, and several large stacks of different-sized pieces of gingerbread.
  • ‘Knekk’ is melted / crack-hard sugar.
  • In the studio, Olli clarifies that, for the purposes of the task, a bridge is considered to be something that has a foundation, and rises above the ground (otherwise it would be a road).

Attempts

Solveig lacks the engineering gene

Contestant: Solveig Kloppen

When introducing the footage of Solveig’s attempt, Olli reminds the audience that one of Solveig’s parents was an engineer, so this task should be comfortably in her wheelhouse. Naturally, the footage starts with Solveig looking over the ingredients in a panic, worrying that she does not have any ideas for her construction.

After becoming increasingly frustrated while trying – and failing – to stack sheets of gingerbread in bridge-like formations at various spots in the study, Solveig eventually has the idea to make a long piece of knekk, which she pours onto a long piece of wax paper on the floor.

Solveig then carefully picks up her knekk creation, and suspends it between two chairs, before quickly telling Olli to measure it. Unfortunately, as Solveig begins to remove her gloves, her knekk bridge breaks in half and shatters on the ground.

With only five minutes left, Solveig scrambles to try to connect pieces of gingerbread with more knekk to make a bridge, but is unsuccessful. When, in desperation, she asks Olli what she needs to do, Olli simply replies that she needs to build a bridge.

Solveig informs Olli that her father had been an engineer – but an electrical engineer, not a civil one. With her time running out, she connects two sheets of gingerbread with knekk, balances it between two chairs, and then carefully crawls underneath it.

In the studio, Alte expresses his astonishment that Solveig had even attempted to make a bridge out of the knekk alone, given that its main quality is in its name (‘knekk’ means ‘break’). Solveig admits that her father would be ashamed of her.

Solveig constructs a 41cm bridge, and earns last place.


Siri attended carpentry school

Contestant: Siri Kristiansen

While measuring the space in the archway leading from the study to the stairs, Siri reveals that she once attended carpentry school, and had won a bridge-building competition while she was there.

She overlaps sheets of gingerbread on top of each other, musing that most of the contestants will likely try to stick the edges of individual sheets together, creating much weaker bridges.

At some point, Siri’s bridge plan changes, as instead of running the span of the archway in the study, she balances one end of her bridge on the fireplace mantel, and the other end on the nose of the taxidermy Norwegian red deer, next to the staircase.

Siri is easily able to walk underneath her bridge, which then collapses almost immediately afterwards.

In the studio, Atle tells Siri that her bridge was by far the most beautiful, until it collapsed. Siri replies that is often the case with Norwegian bridges, in response to which Atle questions whether she had been involved with Tretten Bridge (which collapsed in 2022, after only 10 years of use). Siri jokes that, yes, she was the designer.

Siri builds a 150cm bridge, and earns second place.


Kristoffer partakes in low-threshold limbo

Contestant: Kristoffer Olsen

After reading the task brief, Kristoffer posits that the extent to which each contestant knows how to make knekk will determine how successful they are in constructing their bridges.

While Kristoffer does know how to make knekk, he does not have much experience in bridge building, as he tries to attach individual sheets of gingerbread together by their edges.

He eventually figures out that there needs to be some overlap between the sheets of gingerbread to make it stronger, and so he begins connecting them together that way.

Kristoffer’s bridge mainly spans between two chairs, with a support structure built out of gingerbread to help hold it up near one of them. He attempts to continue an extension past the chairs, but it eventually collapses.

To pass under his bridge, he slowly slides underneath it on his back, carefully extending his arms out parallel to the floor ahead of himself, as he does not have much room to manoeuvre, thanks to his gingerbread support structure.

Olli calls Kristoffer’s cautionary movement a “low-threshold limbo”, especially when it comes time for Kristoffer’s ample stomach to pass beneath the bridge (which Kristoffer calls “a critical point”).

Kristoffer builds a 74cm bridge, and earns third place.


Leo builds a ramp

Contestant: Leo Ajkic

Prior to the first part of Leo’s attempt being shown, Kristoffer had been shown talking about how a contestant would need to know how to make knekk in order to make a long bridge.

Naturally, the footage then cuts to Leo making a complete mess of the process, stirring together sugar, icing sugar, and water in a saucepan, before adding gelatin (in the form of the Seigmenn) for good measure. Leo’s mess boils over and spills onto the ground, but seems to be sticky enough to actually hold the sheets of gingerbread together.

Leo anchors one end of his bridge in the mouth of the taxidermy Norwegian red deer next to the staircase, draping the rest of it over various items in the study to keep it off of the ground.

It would be generous to call Leo’s construction a bridge – it much more closely resembles a ramp or slide. However, he is able to duck underneath the part of his bridge that runs between the taxidermy deer and the next object.

In the studio, Olli clarifies that, in terms of the task, a bridge is considered to be something that has a foundation, and is raised above the ground. As such, much of Leo’s 560cm construction is not actually considered valid – and only the 58cm section from the taxidermy deer to the first item Leo had used to hold his bridge above the floor is measured.

Leo therefore earns fourth place.


Calle thinks vertically

Calle is the only contestant to move his construction out of the study. He decides to build it upstairs, laying individual Seigmenn on the ground, equidistant from one other, as tiny platforms to hold sheets of gingerbread just above the ground.

Calle continues with this building method throughout his attempt, appearing to cover most of the top floor of the house with one continuous length of slightly elevated gingerbread.

After confirming with Olli that he needs to be able to pass underneath his bridge, Calle then simply walks down the stairs and underneath the archway leading into the study, thus passing underneath the part of his bridge which is on the floor above him. This revelation particularly bothers Solveig, who puts her head in her hands, in the studio.

Calle builds a 15.3 metre bridge, and wins the task.


Points

Contestant Points Notes
Calle Hellevang-Larsen 5
Siri Kristiansen 4
Kristoffer Olsen 3
Leo Ajkic 2
Solveig Kloppen 1

Media

Similar tasks

Tags

bridges · candies · candy · gingerbread · icing sugar · sugar · sweets · building · constructing · making · passing · beneath · longest · only · underneath