Skip to content
Taskmaster Wiki

Build a sand bridge across the river (Stormester Season 7 Episode 5)

From Taskmaster Wiki
Build a sand bridge across the river
ShowStormester
SeasonSeason 7
EpisodeEpisode 5: The cabbage master
Air date14 July 2023
TypeSolo Creative Mental Filmed Objective Single-brief Adapted
Master taskBuild a sand bridge across the river
LocationStormester House (Season 7 - One More Chance Special)
Winner(s)Anders Lund Madsen
Points awarded9
Disqualifications3

Task brief

The task brief is laid next to an egg on a model of a pastoral scene which has been set up on a table in the lab.

Build the highest sand bridge above the river.

Your sand bridge must be able to support the weight of the egg.

The egg must be able to pass under the sand bridge.

You may not leave the room.

You have 20 minutes.

Highest sand bridge wins.

Your time starts now.

Task notes

  • There is a river running through the pastoral scene, which also features a barn, a wooden horse, and some model trees.
  • On two smaller tables flanking the large table are two buckets: one containing water, and the other containing sand.
  • Hidden inside the table, if the contestants notice the clue in the form of the wooden horse, are a variety of colourful building supplies which are not actually that useful for constructing a tall bridge.
  • Lasse reveals, in the studio, that photos of the contestants’ bridges had been shown to the audience in attendance at the previous episode’s recording, when the contestants were absent, and the audience had been asked whether they would describe each of them as a ‘sand bridge’. It is therefore by audience consensus that Lasse is able to judge whether each given bridge could be considered to meet the objective of the task.

Variations

In this version of the task, the clue to the presence of hidden building supplies is given by the inclusion of a miniature wooden Trojan horse.

Attempts

Petra stacks some tables

Contestant: Petra Nagel

After looking around the room and at everything at her disposal, Petra moves one of the buckets to the ground so she can use the small table it was on. She stands the table on the model, and its legs are just wide enough to span the river.

She then abandons this idea, instead moving the entire model itself to the floor, so she can use the large table on which it was presented as her bridge. Petra then stacks one of the smaller tables on top of the large one, though she is worried about the fact that her bridge is now leaning at an angle.

She then starts to spread dry sand over everything, declaring that the bridge shouldn't need much sand before it can be called a ‘sand bridge’.

Finally, she provides additional support on either side of the large table by leaning two stepladders against it.

Petra is disqualified, however, after it is determined that she did not build a qualifying sand bridge.

Kathrine uses her shoes

Realising that the sand bridge will need something sturdy within it to stay standing, Kathrine looks around the room for anything that she might be able to use.

Although it is not shown in the edit, she initially experiments with trying to make a bridge using the model trees (but this presumably fails because they are not large enough to span the river and allow an egg to pass underneath). She then removes her tan-and-orange-coloured Crocs, and leans them against one other, to create an arch shape across the river.

Once stabilised, she begins to pile wet sand on the flat area where the two heels of the Crocs meet. She then carefully balances the egg on top of this sand platform, and her bridge holds.

In the studio, Kathrine attempts to defend her bridge by saying that her shoes were “sand-coloured”. Anders makes a pun about how Kathrine had, in fact, built a “sandal” bridge.

Kathrine is disqualified, however, after it is determined that she did not build a qualifying sand bridge.

Hadi builds multiple bridges

Contestant: Hadi Ka-koush

Hadi begins to tear apart the model barn, asking Mark if the foundation of the bridge also needs to be made of sand, or just the bridge itself.

He uses pieces of the broken barn to create a small bridge over the river but, when he tests its durability with his finger, to see if it could support the egg, the bridge immediately collapses. He then appears to find a way to keep the barn bridge sturdy enough to hold some weight, as he is next seen patting down a layer of sand on top of the bridge.

Hadi then decides to build a taller bridge, further down the river, using the small side tables which were supporting the buckets. This idea eventually morphs into him placing the two small tables at the opposite diagonal corners of the model, and then stacking the buckets on top of them.

The destroyed barn is then placed as a bridge connecting the two buckets, with Hadi replacing the roof of the barn as well as he can.

The roof of the barn has some sand on top of it, and he rests the egg directly in the middle of this.

Hadi is disqualified, however, after it is determined that he did not build a qualifying sand bridge.

Jesper uses some thingamabobs

Jesper begins by pouring the majority of the sand onto the model, and uses some of the water from the river to wet it enough to start sculpting with it, singing an improvised song about building a sand bridge as he does so.

He is then seen checking out the barn, and the horse within it. He apparently inspects and breaks apart the horse, looking for some kind of clue, but the footage of this is not included in the edit. He does identify that it is intended to represent the Trojan horse, though, and this leads to him inspecting the large table more closely, knocking on its edges to identify whether there are any hidden compartments.

This search proves fruitful, as he discovers that one side of the table opens up to reveal a collection of various “thingamabobs” and “stuff” which might be used to help with his construction, including some small wooden planks, blocks, and arches, and balloons. He initially tries to make a bridge using the planks, but quickly realises that the egg would not be able to pass under them.

After a few false starts, Jesper eventually uses two arches to form the main structure of his bridge, and he then covers them with enough sand that they are mostly hidden from view. He uses the water bucket to refill the river, and then adds a stick and an inflated balloon to the top of his bridge, to add some height.

As his time runs out, Jesper sings Kong Christian stod ved højen mast (‘King Christian stood by the lofty mast’), one of the two official national anthems of Denmark.

In the studio, his bridge is determined to qualify as a sand bridge, and it is revealed that it was 55 centimetres tall, which earns him second place.

Anders disappoints himself

Contestant: Anders Lund Madsen

After experimenting with turning one of the side tables into a bridge, Anders points out that making a bridge solely out of sand is a difficult task, but that he is going to try anyway.

He creates two mounds of sand on either side of the river before sighing loudly, as he still has no ideas for how to turn them into an actual bridge.

He takes some time to complain about the “shitty” model horse on the table, noting that there’s nothing in it that he can use (he had presumably also made the Trojan horse connection, but had not thought to check if the table itself was a Trojan horse).

Anders tears the roof off of the barn, and uses that as the base of his bridge, burying it in enough sand to hide its presence. To add height to the bridge, he builds the two mounds of sand on either side of the river up as high as he can, before topping them off with the model trees and the horse. He mutters that he hopes that his children will not watch the task, and describes his bridge as shit, before leaving the lab.

In the studio, he confirms his disappointment in himself, noting that he is not only a fan of Greek mythology, but that his father was an engineer who’d taken structural integrity very seriously. He blames his failure to realise that the table itself was hiding building materials on his immense dislike of the model horse. However, his bridge is determined to qualify as a sand bridge, and it is revealed that it had been measured at 62 centimetres, which wins him the task.

Points

Contestant Points Notes
Anders Lund Madsen 5
Jesper Ole Feit Andersen 4
Hadi Ka-koush 0 Disqualified
Kathrine Abrahamsen 0 Disqualified
Petra Nagel 0 Disqualified

Similar tasks

Tags

arches · balloons · barns · blocks · bridges · eggs · horses · miniatures · models · planks · sand · tables · trees · water · balancing · building · constructing · finding · not leaving · supporting · highest